Guided by the nation’s “dual carbon” strategy, construction of the Yarlung Tsangpo River Hydropower Project has officially commenced. As the largest hydropower project in human history, it bears the heavy responsibility of driving the green energy transition and promoting regional economic development. The entire project is expected to involve a total investment of 1.2 trillion yuan, involving the construction of five cascade power stations. Annual power generation is projected to reach 300 billion kilowatt-hours—a scale equivalent to three Three Gorges Dams. Upon completion, it is expected to generate over 20 billion yuan in annual fiscal revenue for Tibet, create 200,000 direct jobs, and support employment for nearly one million people, enabling Tibet to transition from relying on external financial support to becoming self-sustaining.
Such a massive project involves a long construction cycle and a large workforce, creating an urgent need for temporary structures. Our company, Xinmeizhu, specializes in prefabricated container-style temporary buildings and modular prefabricated housing, making them the ideal solution to meet these demands.

Xinmeizhu’s modular container-based temporary structures feature modular design and factory production. With the container serving as the basic unit, they are easy to transport and particularly well-suited for large-scale projects with multiple construction sites, such as the Yajiang Hydropower Station. These units can be used individually or combined horizontally and vertically to create spacious living spaces such as meeting rooms, dormitories, kitchens, and restrooms. They can also be stacked vertically to flexibly accommodate various functional requirements. The structural units are welded from special-profile steel, and the modules are connected via bolts, ensuring a simple structure and rapid installation. The main frame is robust and durable, constructed entirely of steel, offering strong resistance to seismic activity and deformation, and capable of withstanding harsh natural environments. Furthermore, the units feature excellent sealing performance and superior watertightness. With a service life of over 20 years and the ability to be reused multiple times, they help reduce project costs.
Xinmeizhu’s Modular Container Temporary Housing: A Versatile Temporary Construction Solution Adapted to Complex Conditions
We employ modular design and factory-based production, using the container as the basic unit for easy transportation. This makes them particularly suitable for large-scale projects with multiple construction sites, such as the Yajiang Hydropower Station. They can be used individually or combined horizontally and vertically to create spacious functional spaces such as meeting rooms, dormitories, kitchens, and restrooms. They can also be stacked vertically to flexibly meet various functional requirements.
• Core Features: Constructed with a welded frame of high-strength steel, our units withstand wind speeds up to Level 12 and seismic intensity up to 8, easily adapting to the Ya Jiang River basin’s mountainous terrain, intense UV radiation, and significant diurnal temperature fluctuations. The pod surfaces undergo special anti-corrosion treatment to resist oxidation and corrosion under the high-altitude sun, ensuring a service life of over 20 years.

• Flexible Applications:
◦ Dormitory Areas: Standard 3-meter × 6-meter units can accommodate 4–6 people. Equipped with built-in insulation and a ventilation system, these units maintain indoor temperatures 5–8°C higher than traditional prefabricated buildings in winter. In summer, heat dissipates quickly through roof vents, alleviating temperature fluctuations common in high-altitude living environments.
◦ Office Areas: Multiple units can be combined to create meeting rooms ranging from 100 to 500 square meters. Equipped with removable partition walls, the space can be adjusted as needed to accommodate large-scale meetings such as supervision briefings and technical handover sessions.

◦ Special-purpose zones: Customized units can be converted into laboratories (with built-in anti-static flooring), medical stations (equipped with disinfection systems), or even combined to form temporary material warehouses with built-in moisture-proof platforms to protect engineering equipment from humidity.
• Case Study: For Shudao Group’s Sichuan Road & Bridge projects—including expressways and tunnels—we planned, designed, constructed, and installed prefabricated modular temporary office buildings and living quarters for 300 project personnel, completing the installation in just 15 days. Despite being located in a region prone to frequent earthquakes and sudden torrential rains, the units remained undamaged, with no leaks at the joints and interiors kept dry. This earned praise from both the project department and the parent company, and the project has become a benchmark reference for construction in other project sections.

Xinmeizhu Prefabricated Modular Buildings: A Highly Efficient and Cost-Effective Choice That Meets Basic Essential Needs
Prefabricated modular buildings are categorized into K-type and T-type structures. Featuring a light-gauge steel frame and sandwich panels as the exterior cladding, they are configured according to standard modular series. Components are bolted together, making them an environmentally friendly and economical solution for temporary housing. Construction is extremely fast, significantly reducing the time required to erect temporary facilities and allowing projects to get back on track quickly. At the same time, they are cost-effective, recyclable, and have a long service life, offering clear advantages in terms of overall cost. Furthermore, they generate no construction waste, aligning with the principles of green construction.
They are ideal for use as short-term office spaces or temporary dormitories for construction crews. Additionally, they can serve as emergency shelters, temporary guard booths, and warehouses; as entrance guard booths for construction sites equipped with anti-theft doors and windows; or as small tool sheds, allowing construction workers to access equipment conveniently nearby.
Modular buildings can also be used for industrial parks: Deep in the Liangshan Mountains, where the terrain is rugged and roads are treacherous, we constructed a 4,000-square-meter K-style modular building industrial park for highway construction workers, accommodating over 200 people. The facility includes office areas, dormitories, living quarters, laboratories, and conference halls, significantly reducing construction costs.

Whether it’s modular units designed for the complex high-altitude environment or prefabricated buildings that prioritize efficiency and cost-effectiveness, we provide a full-service solution—covering design, production, transportation, installation, and after-sales support—tailored to the construction schedule, workforce size, and site conditions of the Yajiang Hydropower Station. We create customized temporary construction solutions that meet your specific requirements, from spatial layout to exterior design. In terms of pricing, we are committed to offering highly competitive quotes that help you reduce costs while ensuring product quality. For after-sales service, our professional team is on standby at all times to respond quickly to your needs and promptly resolve any issues that arise during use.
To date, numerous large-scale engineering projects have selected our products and received consistent praise. In past projects, thanks to our efficient processes and professional team, we have completed projects in as little as 10 days from order placement to installation, securing a head start for the smooth progress of the projects. During installation, our technical specialists ensure precision at every stage, guaranteeing the safety and quality of the temporary facilities.
The Yajiang Hydropower Station project is a national priority. We are committed to contributing to this endeavor with our high-quality modular temporary housing and prefabricated buildings. We look forward to collaborating with the project’s construction team to help ensure the early completion of this monumental project and generate greater economic and social benefits.