Mingxin Industrial Leibo Office Building

Mingxin Industrial Leibo Office Building

  • Construction unit: Leibo Mingxin Industrial Development Co., Ltd
  • Construction area: usable area of 1100 square meters
  • Construction period: 40 days
  • Project Overview: This project is a turnkey project (integrating exterior and interior decoration, moving in), consisting of two floors, including 12 offices, kitchens, restaurants, 1 conference room, public restrooms, and 23 staff dormitories. The roof has been treated with sloping drainage, and heating is installed in all rooms. The dormitories are all single rooms with integrated bathrooms, which is convenient for later turnover and reuse.

发表回复

您的邮箱地址不会被公开。 必填项已用 * 标注

Search

Latest Posts

Categories